Leeming – Bathroom Renovation

This was a 40-year-old house with an original bathroom and WC. The job included: full stripout; new waterproofing; porcelain tiles to walls and floor; wall hung vanity with stone bench and mixer taps; Bette bath (30-year warrantee); mixer shower with 2-in-1 rail and a frameless shower enclosure completed the renovation.

Interest Free Finance Available

Click below to check your eligability.

Request a Quote

Request a Quote